WARNING: This is a development version of myUMBC. All content should be considered for testing purposes only and could be changed or deleted at any time.
From the VP of operations: All, This notice is to inform you of upcoming system outages that Facilities Management is planning in order to perform repairs to critical systems. I ask all...
All, The Beckman centrifuge needs a new spindle drive. The work will proceed on Monday. Until then, the high speed centrifuge in room 424 is available for use. If unsure what you are doing,...
All, It appears we lost a sensor to tell the autoclave that the door has closed before pressurizing. Jaclyn Casey has been called and will not be out until Monday. The second and third floor...
All, Both rooms 308 and 408 have had their control panel and wireless transponder respectively, replaced. All wireless capabilities are available in conference rooms 308 and 408. Thank you...
All, I wanted to give you an update on the equipment deliveries expected this week. First, the two Millipore A10 systems were installed today We had our Vacuum technologies glovebox...
Due to the passing of Representative Elijah Cummings, Dr. Hrabowski will be delaying his film session on the third floor of the building until sometime next week. I'll let you know when I hear...
All, Our HVAC installation company, Semco confirmed this morning that they would be able to return to ILSB on Saturday, 11/9/2019 to perform the additional testing and install additional seals...
All, I wanted to give everyone a heads up that Dr. Hrabowski will be filming this Friday afternoon outside of room 308 he will be using room 308 for prep. Details: Date: Friday October...
All, Jaclyn Casey from Steris will be here on Thursday morning running the autoclaves through several cycles as part of their start up procedures. Autoclaves will be unavailable for a few hours...