<?xml version="1.0"?>
<News hasArchived="false" page="4" pageCount="9" pageSize="10" timestamp="Fri, 01 May 2026 12:14:03 -0400" url="https://beta.my.umbc.edu/groups/fm/posts.xml?mode=activity&amp;page=4">
<NewsItem contentIssues="true" id="126191" important="true" status="posted" url="https://beta.my.umbc.edu/groups/fm/posts/126191">
<Title>UMBC Stadium Complex - Pedestrian Bridge Installation</Title>
<Tagline>Wednesday, July 27th 2022 and Thursday, July 28th 2022</Tagline>
<Body>
<![CDATA[
    <div class="html-content"><p><span>UMBC is currently
    undertaking several improvements near the UMBC Stadium Complex. A pedestrian
    bridge to the stadium complex will be installed between <strong>Wednesday, July 27<sup>th</sup>
    2022 and Thursday, July 28<sup>th</sup> 2022</strong>. The bridge, which will allow
    for a direct and accessible route from Hilltop Circle to the stadium
    complex, will be shipped to the stadium lot then moved to the project site
    where it will be assembled. The work will require the closure of part of the
    stadium lot, Lot 28 as well as the parking area at the stadium for the dates
    noted above. We will also create a viewing area on Hilltop Circle for those
    interested in watching the setting of the bridge. Please see graphic for
    more detail on the impacts.</span></p><p><span>The bridge and stadium complex
    will open to the campus community later this summer.</span></p><p><span>Accessibility is part of
    the design process, and we work in partnership with Accessibility and
    Disability Services which supports faculty, staff, students and visitors with
    disabilities. If you have a concern about accessibility or want to inquire
    about a disability-based accommodation, please do so through their </span><a href="https://accessibility.umbc.edu/" rel="nofollow external" class="bo"><span>website</span></a><span>.</span></p><p><span>Thank you for your patience
    as we work to maintain and enhance the UMBC campus.</span></p><p><span>For more updates on summer
    construction, please follow </span><a href="https://my3.my.umbc.edu/groups/fm" rel="nofollow external" class="bo"><span>Facilities Management on myUMBC</span></a><span>. </span></p><p><em><span>Facilities Management</span></em></p></div>
]]>
</Body>
<Summary>UMBC is currently undertaking several improvements near the UMBC Stadium Complex. A pedestrian bridge to the stadium complex will be installed between Wednesday, July 27th 2022 and Thursday, July...</Summary>
<AttachmentKind>Image</AttachmentKind>
<AttachmentUrl>https://assets4-beta.my.umbc.edu/system/shared/attachments/393a63364942e71d6eb7bed106eba487/69f4d14b/news/000/126/191/50f2ec48eebb3b01b7bff8e53f0b535f/Bridge-Delivery-Map-Summer-2022.jpg?1657551696</AttachmentUrl>
<Attachments>
<Attachment kind="Image" url="https://beta.my.umbc.edu/groups/fm/posts/126191/attachments/43745"></Attachment>
</Attachments>
<TrackingUrl>https://beta.my.umbc.edu/api/v0/pixel/news/126191/guest@my.umbc.edu/452f91c717383b631a9b757641474c3a/api/pixel</TrackingUrl>
<Group token="fm">Facilities Management</Group>
<GroupUrl>https://beta.my.umbc.edu/groups/fm</GroupUrl>
<AvatarUrl>https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="original">https://assets2-beta.my.umbc.edu/images/avatars/group/3/original.png?1777560876</AvatarUrl>
<AvatarUrl size="xxlarge">https://assets2-beta.my.umbc.edu/images/avatars/group/3/xxlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="xlarge">https://assets1-beta.my.umbc.edu/images/avatars/group/3/xlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="large">https://assets1-beta.my.umbc.edu/images/avatars/group/3/large.png?1777560876</AvatarUrl>
<AvatarUrl size="medium">https://assets3-beta.my.umbc.edu/images/avatars/group/3/medium.png?1777560876</AvatarUrl>
<AvatarUrl size="small">https://assets2-beta.my.umbc.edu/images/avatars/group/3/small.png?1777560876</AvatarUrl>
<AvatarUrl size="xsmall">https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="xxsmall">https://assets4-beta.my.umbc.edu/images/avatars/group/3/xxsmall.png?1777560876</AvatarUrl>
<Sponsor>Facilities Management</Sponsor>
<ThumbnailUrl size="xxlarge">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/191/51a116aa018e1deb93e6625ed143c184/xxlarge.jpg?1657551605</ThumbnailUrl>
<ThumbnailUrl size="xlarge">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/191/51a116aa018e1deb93e6625ed143c184/xlarge.jpg?1657551605</ThumbnailUrl>
<ThumbnailUrl size="large">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/191/51a116aa018e1deb93e6625ed143c184/large.jpg?1657551605</ThumbnailUrl>
<ThumbnailUrl size="medium">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/191/51a116aa018e1deb93e6625ed143c184/medium.jpg?1657551605</ThumbnailUrl>
<ThumbnailUrl size="small">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/191/51a116aa018e1deb93e6625ed143c184/small.jpg?1657551605</ThumbnailUrl>
<ThumbnailUrl size="xsmall">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/191/51a116aa018e1deb93e6625ed143c184/xsmall.jpg?1657551605</ThumbnailUrl>
<ThumbnailUrl size="xxsmall">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/191/51a116aa018e1deb93e6625ed143c184/xxsmall.jpg?1657551605</ThumbnailUrl>
<PawCount>3</PawCount>
<CommentCount>0</CommentCount>
<CommentsAllowed>true</CommentsAllowed>
<PostedAt>Mon, 11 Jul 2022 11:04:12 -0400</PostedAt>
<EditAt>Mon, 11 Jul 2022 11:04:37 -0400</EditAt>
</NewsItem>

<NewsItem contentIssues="true" id="126172" important="true" status="posted" url="https://beta.my.umbc.edu/groups/fm/posts/126172">
<Title>Campus Paving Project</Title>
<Tagline>Paving Project July 11 through August 19</Tagline>
<Body>
<![CDATA[
    <div class="html-content"><p><span>As a part of ongoing campus
    improvements, significant portions of Hilltop Circle, Hilltop road, Poplar
    Avenue and Park Road will be repaved during the remainder of the summer. 
    The project begins on July 11 with the replacement of storm water drains along
    Hillltop Circle.  Paving work on Hilltop Circle from Administration Drive
    to Poplar Avenue will begin July 18 and progress per the schedule outlined in
    the Paving Construction Scheduling Map that can be downloaded using the Download Document button below.  All paving work is
    anticipated to be completed by August 19.</span></p><p><span>While we do not expect extended
    closures, traffic patterns will be revised while the work is completed
    between July 11 and August 19 with intermittent closures. The entrance to
    some parking lots may be closed briefly during the paving process. 
    Parking lot disruptions and closures will be communicated via </span><a href="https://my3.my.umbc.edu/groups/fm" rel="nofollow external" class="bo">Facilities Management on myUMBC</a><span> a week
    prior to the scheduled work.</span></p><p><span>When traveling through campus while the
    paving work is on-going, vehicles should follow detour signs and direction from
    paving personnel.</span></p><p><span>Accessibility is part of the design
    process, and we work in partnership with Accessibility and Disability Services
    which supports faculty, staff, students and visitors with disabilities. If you
    have a concern about accessibility or want to inquire about a disability-based
    accommodation, please do so through their </span><a href="https://accessibility.umbc.edu/" rel="nofollow external" class="bo">website</a><span>.</span></p><p><span>Thank you for your patience as we work to
    maintain and enhance the UMBC campus.</span></p><p><span>For more updates on summer construction,
    please follow </span><a href="https://my3.my.umbc.edu/groups/fm" rel="nofollow external" class="bo">Facilities Management on myUMBC</a><span>. </span></p><p></p>
    
    <p> </p></div>
]]>
</Body>
<Summary>As a part of ongoing campus improvements, significant portions of Hilltop Circle, Hilltop road, Poplar Avenue and Park Road will be repaved during the remainder of the summer.  The project begins...</Summary>
<Website>https://fm.umbc.edu/</Website>
<AttachmentKind>Document</AttachmentKind>
<AttachmentUrl>https://assets4-beta.my.umbc.edu/system/shared/attachments/5cd1c46ac2afe71fe54aa0038c803963/69f4d14b/news/000/126/172/ff5552bd9e89226e299c74531dc90590/Construction Scheduling Map-1.pdf?1657288330</AttachmentUrl>
<Attachments>
<Attachment kind="Document" url="https://beta.my.umbc.edu/groups/fm/posts/126172/attachments/43735"></Attachment>
</Attachments>
<TrackingUrl>https://beta.my.umbc.edu/api/v0/pixel/news/126172/guest@my.umbc.edu/d4522b3433f98fa75655a62d1ea2ca8d/api/pixel</TrackingUrl>
<Group token="fm">Facilities Management</Group>
<GroupUrl>https://beta.my.umbc.edu/groups/fm</GroupUrl>
<AvatarUrl>https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="original">https://assets2-beta.my.umbc.edu/images/avatars/group/3/original.png?1777560876</AvatarUrl>
<AvatarUrl size="xxlarge">https://assets2-beta.my.umbc.edu/images/avatars/group/3/xxlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="xlarge">https://assets1-beta.my.umbc.edu/images/avatars/group/3/xlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="large">https://assets1-beta.my.umbc.edu/images/avatars/group/3/large.png?1777560876</AvatarUrl>
<AvatarUrl size="medium">https://assets3-beta.my.umbc.edu/images/avatars/group/3/medium.png?1777560876</AvatarUrl>
<AvatarUrl size="small">https://assets2-beta.my.umbc.edu/images/avatars/group/3/small.png?1777560876</AvatarUrl>
<AvatarUrl size="xsmall">https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="xxsmall">https://assets4-beta.my.umbc.edu/images/avatars/group/3/xxsmall.png?1777560876</AvatarUrl>
<Sponsor>Facilities Management</Sponsor>
<ThumbnailUrl size="xxlarge">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/172/813bb7e2461ac0ba64b2bb99462b3154/xxlarge.jpg?1657288424</ThumbnailUrl>
<ThumbnailUrl size="xlarge">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/172/813bb7e2461ac0ba64b2bb99462b3154/xlarge.jpg?1657288424</ThumbnailUrl>
<ThumbnailUrl size="large">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/172/813bb7e2461ac0ba64b2bb99462b3154/large.jpg?1657288424</ThumbnailUrl>
<ThumbnailUrl size="medium">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/172/813bb7e2461ac0ba64b2bb99462b3154/medium.jpg?1657288424</ThumbnailUrl>
<ThumbnailUrl size="small">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/172/813bb7e2461ac0ba64b2bb99462b3154/small.jpg?1657288424</ThumbnailUrl>
<ThumbnailUrl size="xsmall">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/172/813bb7e2461ac0ba64b2bb99462b3154/xsmall.jpg?1657288424</ThumbnailUrl>
<ThumbnailUrl size="xxsmall">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/126/172/813bb7e2461ac0ba64b2bb99462b3154/xxsmall.jpg?1657288424</ThumbnailUrl>
<PawCount>5</PawCount>
<CommentCount>1</CommentCount>
<CommentsAllowed>true</CommentsAllowed>
<PostedAt>Fri, 08 Jul 2022 09:58:06 -0400</PostedAt>
<EditAt>Mon, 11 Jul 2022 15:36:58 -0400</EditAt>
</NewsItem>

<NewsItem contentIssues="false" id="126009" important="true" status="posted" url="https://beta.my.umbc.edu/groups/fm/posts/126009">
<Title>Scheduled Water Outage Alert: July 9</Title>
<Tagline>Admin, Engineering, UC, ITE, Sherman &amp; Sondheim</Tagline>
<Body>
<![CDATA[
    <div class="html-content"><div>UMBC is currently undertaking multiple utility improvements on campus. Upgrades to the campus domestic water service will require a scheduled outage to water service at the following buildings: <em>Administration, Engineering, University Center, ITE, Sherman &amp; Sondheim</em>. <strong>The outage will take place on Saturday, July 9, 2022 from approximately 6 a.m. to 6 p.m.</strong> </div><div><br></div><div>Excavations associated with this work will commence on June 27, 2022 near the affected buildings. Please refer to the <a href="https://fm.umbc.edu/files/2022/06/UMBC_Campus_Construction_MapSummer_2022.pdf" rel="nofollow external" class="bo">Facilities Management summer construction map</a> for additional information. Accessible pedestrian routes will be maintained through the area. Service vehicle access to the 220 access road between ITE and Sherman Hall may be impacted June 29 – 30, 2022.</div><div><br></div><div>Accessibility is part of the design process, and we work in partnership with Accessibility and Disability Services which supports faculty, staff, students and visitors with disabilities. If you have a concern about accessibility or want to inquire about a disability-based accommodation, please do so through their <a href="https://accessibility.umbc.edu/" rel="nofollow external" class="bo">website</a>.</div><div><br></div><div>Thank you for your patience as we work to maintain and enhance the UMBC campus.</div><div><br></div><div>For more updates on summer construction, please follow <a href="https://my3.my.umbc.edu/groups/fm" rel="nofollow external" class="bo">Facilities Management on myUMBC</a>. </div><div><br></div><div><em>Facilities Management</em></div></div>
]]>
</Body>
<Summary>UMBC is currently undertaking multiple utility improvements on campus. Upgrades to the campus domestic water service will require a scheduled outage to water service at the following...</Summary>
<TrackingUrl>https://beta.my.umbc.edu/api/v0/pixel/news/126009/guest@my.umbc.edu/029c2108618ed0169e9dc1d3fdf29a6b/api/pixel</TrackingUrl>
<Group token="fm">Facilities Management</Group>
<GroupUrl>https://beta.my.umbc.edu/groups/fm</GroupUrl>
<AvatarUrl>https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="original">https://assets2-beta.my.umbc.edu/images/avatars/group/3/original.png?1777560876</AvatarUrl>
<AvatarUrl size="xxlarge">https://assets2-beta.my.umbc.edu/images/avatars/group/3/xxlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="xlarge">https://assets1-beta.my.umbc.edu/images/avatars/group/3/xlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="large">https://assets1-beta.my.umbc.edu/images/avatars/group/3/large.png?1777560876</AvatarUrl>
<AvatarUrl size="medium">https://assets3-beta.my.umbc.edu/images/avatars/group/3/medium.png?1777560876</AvatarUrl>
<AvatarUrl size="small">https://assets2-beta.my.umbc.edu/images/avatars/group/3/small.png?1777560876</AvatarUrl>
<AvatarUrl size="xsmall">https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="xxsmall">https://assets4-beta.my.umbc.edu/images/avatars/group/3/xxsmall.png?1777560876</AvatarUrl>
<Sponsor>Facilities Management</Sponsor>
<PawCount>1</PawCount>
<CommentCount>0</CommentCount>
<CommentsAllowed>true</CommentsAllowed>
<PostedAt>Thu, 23 Jun 2022 12:51:27 -0400</PostedAt>
</NewsItem>

<NewsItem contentIssues="true" id="125933" important="false" status="posted" url="https://beta.my.umbc.edu/groups/fm/posts/125933">
<Title>Updated Campus Construction Map</Title>
<Tagline>Pardon Our Progress!</Tagline>
<Body>
<![CDATA[
    <div class="html-content">The Campus Construction Map has been updated and posted to the Facilities Management Webpage (<a href="https://fm.umbc.edu/">https://fm.umbc.edu/</a>).  The map has been updated to note all construction work planned for the next serveral months.  Anyone with questions or concerns about a project can call the UMBC Design and Construction office at 455-5664 and you will be directed to the UMBC Project Manager overseeing the project.  There is a great deal of construction happening....Pardon Our Progress!</div>
]]>
</Body>
<Summary>The Campus Construction Map has been updated and posted to the Facilities Management Webpage (https://fm.umbc.edu/).  The map has been updated to note all construction work planned for the next...</Summary>
<Website>https://fm.umbc.edu/</Website>
<AttachmentKind>Document</AttachmentKind>
<AttachmentUrl>https://assets3-beta.my.umbc.edu/system/shared/attachments/cf4de334dada064ce97212ca6b86964f/69f4d14b/news/000/125/933/332d62c00e4e7218915d19a6f084d0ae/UMBC_Campus_Construction_MapSummer_2022.pdf?1655466761</AttachmentUrl>
<Attachments>
<Attachment kind="Document" url="https://beta.my.umbc.edu/groups/fm/posts/125933/attachments/43645"></Attachment>
</Attachments>
<TrackingUrl>https://beta.my.umbc.edu/api/v0/pixel/news/125933/guest@my.umbc.edu/26c5a00bb221b57794f6a6b28a997fd0/api/pixel</TrackingUrl>
<Group token="fm">Facilities Management</Group>
<GroupUrl>https://beta.my.umbc.edu/groups/fm</GroupUrl>
<AvatarUrl>https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="original">https://assets2-beta.my.umbc.edu/images/avatars/group/3/original.png?1777560876</AvatarUrl>
<AvatarUrl size="xxlarge">https://assets2-beta.my.umbc.edu/images/avatars/group/3/xxlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="xlarge">https://assets1-beta.my.umbc.edu/images/avatars/group/3/xlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="large">https://assets1-beta.my.umbc.edu/images/avatars/group/3/large.png?1777560876</AvatarUrl>
<AvatarUrl size="medium">https://assets3-beta.my.umbc.edu/images/avatars/group/3/medium.png?1777560876</AvatarUrl>
<AvatarUrl size="small">https://assets2-beta.my.umbc.edu/images/avatars/group/3/small.png?1777560876</AvatarUrl>
<AvatarUrl size="xsmall">https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="xxsmall">https://assets4-beta.my.umbc.edu/images/avatars/group/3/xxsmall.png?1777560876</AvatarUrl>
<Sponsor>Facilities Management</Sponsor>
<ThumbnailUrl size="xxlarge">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/933/a3d1e346033a9c19f23d2744ef687f9a/xxlarge.jpg?1655466650</ThumbnailUrl>
<ThumbnailUrl size="xlarge">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/933/a3d1e346033a9c19f23d2744ef687f9a/xlarge.jpg?1655466650</ThumbnailUrl>
<ThumbnailUrl size="large">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/933/a3d1e346033a9c19f23d2744ef687f9a/large.jpg?1655466650</ThumbnailUrl>
<ThumbnailUrl size="medium">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/933/a3d1e346033a9c19f23d2744ef687f9a/medium.jpg?1655466650</ThumbnailUrl>
<ThumbnailUrl size="small">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/933/a3d1e346033a9c19f23d2744ef687f9a/small.jpg?1655466650</ThumbnailUrl>
<ThumbnailUrl size="xsmall">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/933/a3d1e346033a9c19f23d2744ef687f9a/xsmall.jpg?1655466650</ThumbnailUrl>
<ThumbnailUrl size="xxsmall">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/933/a3d1e346033a9c19f23d2744ef687f9a/xxsmall.jpg?1655466650</ThumbnailUrl>
<PawCount>3</PawCount>
<CommentCount>1</CommentCount>
<CommentsAllowed>true</CommentsAllowed>
<PostedAt>Fri, 17 Jun 2022 07:55:43 -0400</PostedAt>
</NewsItem>

<NewsItem contentIssues="true" id="125662" important="true" status="posted" url="https://beta.my.umbc.edu/groups/fm/posts/125662">
<Title>UC and Bio Construction Notice</Title>
<Body>
<![CDATA[
    <div class="html-content"><p><span>Facilities Management is pleased to announce that construction activities related to the University Center Roof and Biology Roof will begin on Tuesday, May 31st, 2022. The project consists of replacing the roof at both buildings. This work will proceed through August 2022.</span></p><p><span>Construction fencing will be installed around the construction area for the duration of the project. The fencing will move as the project moves beginning with Biology and then moving to University Center. The fencing will impact pedestrian walkways by restricting the paths to pedestrian access only. </span></p><p><span>During portions of the University Center work the pedestrian access will be closed along 220' for approximately 2 weeks. This will occur during late July into August. Signage will direct pedestrians around these closures, via accessible routes. </span><span>Any changes or additional information will be communicated through the myUMBC Facility Management Group and other appropriate methods. </span></p><p><span>Please see the attached diagram depicting the extents of the work and impacts to campus described above.</span></p><p><span>Accessibility is part of the design process, and we work in partnership with Accessibility and Disability Services which supports faculty, staff, students and visitors with disabilities. If you have a concern about accessibility, or want to inquire about a disability-based accommodation, please do so through their </span><span><a href="https://accessibility.umbc.edu/" rel="nofollow external" class="bo"><span>website</span></a>.</span></p><p><span>Thank you for your patience as we work to maintain and enhance the UMBC campus.</span></p><p><span>Facilities Management</span></p></div>
]]>
</Body>
<Summary>Facilities Management is pleased to announce that construction activities related to the University Center Roof and Biology Roof will begin on Tuesday, May 31st, 2022. The project consists of...</Summary>
<AttachmentKind>Document</AttachmentKind>
<AttachmentUrl>https://assets2-beta.my.umbc.edu/system/shared/attachments/ffa37183222cacbdb1f36e2af730777e/69f4d14b/news/000/125/662/451d2542bf1e1aeec5ffeaabdda08a3b/UC and Bio Plan Website.pdf?1654101206</AttachmentUrl>
<Attachments>
<Attachment kind="Document" url="https://beta.my.umbc.edu/groups/fm/posts/125662/attachments/43548"></Attachment>
</Attachments>
<TrackingUrl>https://beta.my.umbc.edu/api/v0/pixel/news/125662/guest@my.umbc.edu/52b82868cbddcab7f463767f152fd35c/api/pixel</TrackingUrl>
<Group token="fm">Facilities Management</Group>
<GroupUrl>https://beta.my.umbc.edu/groups/fm</GroupUrl>
<AvatarUrl>https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="original">https://assets2-beta.my.umbc.edu/images/avatars/group/3/original.png?1777560876</AvatarUrl>
<AvatarUrl size="xxlarge">https://assets2-beta.my.umbc.edu/images/avatars/group/3/xxlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="xlarge">https://assets1-beta.my.umbc.edu/images/avatars/group/3/xlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="large">https://assets1-beta.my.umbc.edu/images/avatars/group/3/large.png?1777560876</AvatarUrl>
<AvatarUrl size="medium">https://assets3-beta.my.umbc.edu/images/avatars/group/3/medium.png?1777560876</AvatarUrl>
<AvatarUrl size="small">https://assets2-beta.my.umbc.edu/images/avatars/group/3/small.png?1777560876</AvatarUrl>
<AvatarUrl size="xsmall">https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="xxsmall">https://assets4-beta.my.umbc.edu/images/avatars/group/3/xxsmall.png?1777560876</AvatarUrl>
<Sponsor>Facilities Management</Sponsor>
<ThumbnailUrl size="xxlarge">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/662/1a4f11e1adf070c1d6ebc3eae0d376d3/xxlarge.jpg?1654014587</ThumbnailUrl>
<ThumbnailUrl size="xlarge">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/662/1a4f11e1adf070c1d6ebc3eae0d376d3/xlarge.jpg?1654014587</ThumbnailUrl>
<ThumbnailUrl size="large">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/662/1a4f11e1adf070c1d6ebc3eae0d376d3/large.jpg?1654014587</ThumbnailUrl>
<ThumbnailUrl size="medium">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/662/1a4f11e1adf070c1d6ebc3eae0d376d3/medium.jpg?1654014587</ThumbnailUrl>
<ThumbnailUrl size="small">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/662/1a4f11e1adf070c1d6ebc3eae0d376d3/small.jpg?1654014587</ThumbnailUrl>
<ThumbnailUrl size="xsmall">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/662/1a4f11e1adf070c1d6ebc3eae0d376d3/xsmall.jpg?1654014587</ThumbnailUrl>
<ThumbnailUrl size="xxsmall">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/125/662/1a4f11e1adf070c1d6ebc3eae0d376d3/xxsmall.jpg?1654014587</ThumbnailUrl>
<PawCount>2</PawCount>
<CommentCount>2</CommentCount>
<CommentsAllowed>true</CommentsAllowed>
<PostedAt>Tue, 31 May 2022 12:34:42 -0400</PostedAt>
</NewsItem>

<NewsItem contentIssues="false" id="119377" important="true" status="posted" url="https://beta.my.umbc.edu/groups/fm/posts/119377">
<Title>UPDATE - Hilltop Road - Traffic Impacts Through July</Title>
<Tagline>One-Way Traffic Expected</Tagline>
<Body>
<![CDATA[
    <div class="html-content"><div><div><p><strong>UPDATE 7/1/2022</strong></p><p> </p><p>Hilltop Road will again become one-way traffic
    between the hours of <strong>7 AM and 5 PM</strong> on the following days:</p><p><span>·<span>        
    </span></span><strong>Thursday, July
    7th 2022 - Friday, July 8th 2022</strong></p><p><span>·<span>        
    </span></span><strong>Monday, July 25th
    2022 - Friday, July 29th 2022</strong></p><p>The road will be opened in both
    directions in the evenings during these times.</p><p>Thank you for your continued patience as we work
    to maintain and enhance the UMBC campus.</p>
    
    
    
    
    
    
    
    
    
    
    
    </div><p><strong><em><br></em></strong></p></div><blockquote><div><p><strong>UPDATE 5/27/2022</strong></p></div><span>Due to weather conditions, the partial Hilltop Road closure will be extended. Hilltop Road will remain one-way traffic between the hours of <strong>6 AM and 4 PM</strong> through <strong>Friday, June 3rd, 2022.</strong></span><br><blockquote><div><p><em><br></em></p></div></blockquote></blockquote><p></p><p><span><strong><br></strong></span></p><blockquote><p><span><strong>UPDATE 5/18/2022</strong></span></p><p><span>The domestic water work at
    Hilltop Road has been rescheduled to minimize impact on the campus community.
    Hilltop Road will now become one-way traffic between the hours of <strong>6 AM and 4 PM</strong>
    only on the following days:</span></p></blockquote><ul><ul><li><strong><span>Wednesday, May 18th 2022</span></strong></li><li><strong><span>Friday, May 20th 2022</span></strong></li><li><strong><span>Monday, May 23rd 2022</span></strong></li><li><strong><span>Tuesday, May 24th 2022</span></strong></li></ul></ul><blockquote><p><span> </span></p><p><span><strong>ORIGINAL NOTIFICATION
    FROM 5/12/2022</strong></span></p></blockquote><blockquote><p><span><em>UMBC is currently
    undertaking multiple utility improvements on campus. Upgrades to the campus domestic
    water service will require Hilltop Road to become one-way traffic at times over
    the next several days. Traffic between the Wilkens Avenue circle and Hilltop
    Circle will be one way outbound only (from Hilltop Circle to Wilkens Avenue). Vehicles
    entering campus via Hilltop Road should follow detour signs and direction from on-site
    personnel. Pedestrian access will not be impacted. Access to Lot 22 will be
    maintained at all times during the closures which will occur</em></span></p><ul><li><em><s><span>This Friday, <strong>May
    13th 2022, 6 AM-11 AM</strong></span></s></em></li><li><em><span><em><s><span>Next Monday through
    Friday, <strong>May 16th 2022-May 20th 2022, 6 AM-4 PM</strong></span></s></em> </span></em></li></ul></blockquote>
    
    <blockquote><p><em><span>Accessibility is part of the design process,
    and we work in partnership with Accessibility and Disability Services which
    supports faculty, staff, students and visitors with disabilities. If you have a
    concern about accessibility or want to inquire about a disability-based
    accommodation, please do so through their </span><a href="https://accessibility.umbc.edu/" rel="nofollow external" class="bo">website</a><span>.</span></em></p><p><em><span><span>Thank you for your patience as we work to
    maintain and enhance the UMBC campus.</span></span></em></p><p><span><span><em>Facilities Management</em></span></span></p></blockquote></div>
]]>
</Body>
<Summary>UPDATE 7/1/2022     Hilltop Road will again become one-way traffic between the hours of 7 AM and 5 PM on the following days:  ·         Thursday, July 7th 2022 - Friday, July 8th 2022  ·        ...</Summary>
<TrackingUrl>https://beta.my.umbc.edu/api/v0/pixel/news/119377/guest@my.umbc.edu/43ed3a1879d679d09629f5d019564c55/api/pixel</TrackingUrl>
<Group token="fm">Facilities Management</Group>
<GroupUrl>https://beta.my.umbc.edu/groups/fm</GroupUrl>
<AvatarUrl>https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="original">https://assets2-beta.my.umbc.edu/images/avatars/group/3/original.png?1777560876</AvatarUrl>
<AvatarUrl size="xxlarge">https://assets2-beta.my.umbc.edu/images/avatars/group/3/xxlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="xlarge">https://assets1-beta.my.umbc.edu/images/avatars/group/3/xlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="large">https://assets1-beta.my.umbc.edu/images/avatars/group/3/large.png?1777560876</AvatarUrl>
<AvatarUrl size="medium">https://assets3-beta.my.umbc.edu/images/avatars/group/3/medium.png?1777560876</AvatarUrl>
<AvatarUrl size="small">https://assets2-beta.my.umbc.edu/images/avatars/group/3/small.png?1777560876</AvatarUrl>
<AvatarUrl size="xsmall">https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="xxsmall">https://assets4-beta.my.umbc.edu/images/avatars/group/3/xxsmall.png?1777560876</AvatarUrl>
<Sponsor>Facilities Management</Sponsor>
<PawCount>1</PawCount>
<CommentCount>0</CommentCount>
<CommentsAllowed>true</CommentsAllowed>
<PostedAt>Thu, 12 May 2022 12:47:55 -0400</PostedAt>
<EditAt>Fri, 01 Jul 2022 13:17:09 -0400</EditAt>
</NewsItem>

<NewsItem contentIssues="true" id="113738" important="true" status="posted" url="https://beta.my.umbc.edu/groups/fm/posts/113738">
<Title>Campus Utility Improvements</Title>
<Tagline>Pedestrian and electrical impacts near Admin and Sondheim</Tagline>
<Body>
<![CDATA[
    <div class="html-content"><p><span>UMBC is
    currently undertaking multiple utility improvements on campus. In order to
    upgrade the electrical equipment serving buildings in the academic core, the
    walkway between Sherman and Sondheim Halls will be partially closed during the
    day on Tuesday, November 2nd, 2021. This will allow for the installation of
    equipment near Sondheim Hall. Additionally, the southeast Sherman entrance
    (facing Sondheim) and the southwest Sondheim entrance (facing Sherman) will be
    emergency egress only on that day. Signs will direct pedestrians around the
    closures via accessible routes. All teaching and office spaces in adjacent
    buildings will remain accessible during this time. The walkway
    between Sherman and Sondheim Halls will reopen to pedestrians on
    Tuesday evening. Please see the attached diagram depicting the extents of
    the closure and available pedestrian routes.</span><span></span></p>
    
    <p><span>The
    southwest Sondheim entrance will be open to pedestrians but will not be a fully
    accessible route through Sunday, November 14th, 2021. Signs will direct
    pedestrians to an accessible entrance at the north side of the building. A
    temporary electric generator will remain in place during this time to provide
    power to adjacent buildings. It will not impact accessible pedestrian routes.</span><span></span></p>
    
    <p><span>Lastly, the
    Sondheim and Administration buildings will experience planned electrical
    outages during the following times:</span><span></span></p>
    
    <p><span>1. Sunday
    October 31st, 2021, 6 AM – 2 PM</span><span></span></p>
    
    <p><span>2. Sunday
    November 7th, 2021, 6 AM – 10 AM</span><span></span></p>
    
    <p><span>3. Sunday
    November 14th, 2021, 6 AM – 2 PM</span><span></span></p>
    
    <p><span>The
    buildings, except for emergency equipment, will be without power during the
    above times.</span><span></span></p>
    
    <p><span>Accessibility
    is part of the design process, and we work in partnership with Accessibility
    and Disability Services which supports faculty, staff, students and visitors
    with disabilities. If you have a concern about accessibility or want to inquire
    about a disability-based accommodation, please do so through their <a href="https://accessibility.umbc.edu/" rel="nofollow external" class="bo"><span>website</span></a>.</span><span></span></p>
    
    <p><span>Thank you
    for your patience as we work to maintain and enhance the UMBC campus.</span><span></span></p>
    
    <p><span>Facilities
    Management</span><span></span></p><br></div>
]]>
</Body>
<Summary>UMBC is currently undertaking multiple utility improvements on campus. In order to upgrade the electrical equipment serving buildings in the academic core, the walkway between Sherman and Sondheim...</Summary>
<AttachmentKind>Image</AttachmentKind>
<AttachmentUrl>https://assets4-beta.my.umbc.edu/system/shared/attachments/ecf6de26ac54ef6f220bcd6c43231c8d/69f4d14b/news/000/113/738/5ee85f64aafcce6b24e3e1171a475ea6/UMBC Utility 1 - Notification 2021 11 02b.jpg?1635438320</AttachmentUrl>
<Attachments>
<Attachment kind="Image" url="https://beta.my.umbc.edu/groups/fm/posts/113738/attachments/41239"></Attachment>
</Attachments>
<TrackingUrl>https://beta.my.umbc.edu/api/v0/pixel/news/113738/guest@my.umbc.edu/ba7dda3001933cde0f8beaf754340555/api/pixel</TrackingUrl>
<Group token="fm">Facilities Management</Group>
<GroupUrl>https://beta.my.umbc.edu/groups/fm</GroupUrl>
<AvatarUrl>https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="original">https://assets2-beta.my.umbc.edu/images/avatars/group/3/original.png?1777560876</AvatarUrl>
<AvatarUrl size="xxlarge">https://assets2-beta.my.umbc.edu/images/avatars/group/3/xxlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="xlarge">https://assets1-beta.my.umbc.edu/images/avatars/group/3/xlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="large">https://assets1-beta.my.umbc.edu/images/avatars/group/3/large.png?1777560876</AvatarUrl>
<AvatarUrl size="medium">https://assets3-beta.my.umbc.edu/images/avatars/group/3/medium.png?1777560876</AvatarUrl>
<AvatarUrl size="small">https://assets2-beta.my.umbc.edu/images/avatars/group/3/small.png?1777560876</AvatarUrl>
<AvatarUrl size="xsmall">https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="xxsmall">https://assets4-beta.my.umbc.edu/images/avatars/group/3/xxsmall.png?1777560876</AvatarUrl>
<Sponsor>Facilities Management</Sponsor>
<ThumbnailUrl size="xxlarge">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/738/fe86d17076bc6d8237df747f888f8cf2/xxlarge.jpg?1635438340</ThumbnailUrl>
<ThumbnailUrl size="xlarge">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/738/fe86d17076bc6d8237df747f888f8cf2/xlarge.jpg?1635438340</ThumbnailUrl>
<ThumbnailUrl size="large">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/738/fe86d17076bc6d8237df747f888f8cf2/large.jpg?1635438340</ThumbnailUrl>
<ThumbnailUrl size="medium">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/738/fe86d17076bc6d8237df747f888f8cf2/medium.jpg?1635438340</ThumbnailUrl>
<ThumbnailUrl size="small">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/738/fe86d17076bc6d8237df747f888f8cf2/small.jpg?1635438340</ThumbnailUrl>
<ThumbnailUrl size="xsmall">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/738/fe86d17076bc6d8237df747f888f8cf2/xsmall.jpg?1635438340</ThumbnailUrl>
<ThumbnailUrl size="xxsmall">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/738/fe86d17076bc6d8237df747f888f8cf2/xxsmall.jpg?1635438340</ThumbnailUrl>
<PawCount>1</PawCount>
<CommentCount>0</CommentCount>
<CommentsAllowed>true</CommentsAllowed>
<PostedAt>Fri, 29 Oct 2021 09:06:11 -0400</PostedAt>
</NewsItem>

<NewsItem contentIssues="true" id="113015" important="false" status="posted" url="https://beta.my.umbc.edu/groups/fm/posts/113015">
<Title>Soccer Hillside Repair project</Title>
<Tagline>Service Road Temporary Closure - Update</Tagline>
<Body>
<![CDATA[
    <div class="html-content"><div>Update - The service road between Shelbourne Road and the Chesapeake Employers Insurance Arena will be closed for the remainder of this week during normal working hours.  The service road should be open again the evening of October 15th.  For everyone's safety, please use Wilkens Avenue, I-195 or Poplar Avenue to gain access to campus.  Thank you for your patience as we continue to improve our campus.</div><div><br></div><div><br></div><div><div><br></div><div><br></div></div></div>
]]>
</Body>
<Summary>Update - The service road between Shelbourne Road and the Chesapeake Employers Insurance Arena will be closed for the remainder of this week during normal working hours.  The service road should...</Summary>
<AttachmentKind>Image</AttachmentKind>
<AttachmentUrl>https://assets3-beta.my.umbc.edu/system/shared/attachments/54ca1c5c378a03e423d711f935c13aac/69f4d14b/news/000/113/015/243153b1d3e9aae08821d40e3b402ffe/2021-UMBC-campus-map.jpg?1633542779</AttachmentUrl>
<Attachments>
<Attachment kind="Image" url="https://beta.my.umbc.edu/groups/fm/posts/113015/attachments/40862"></Attachment>
</Attachments>
<TrackingUrl>https://beta.my.umbc.edu/api/v0/pixel/news/113015/guest@my.umbc.edu/93f97c317d37b4ab4aea38c798346398/api/pixel</TrackingUrl>
<Group token="fm">Facilities Management</Group>
<GroupUrl>https://beta.my.umbc.edu/groups/fm</GroupUrl>
<AvatarUrl>https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="original">https://assets2-beta.my.umbc.edu/images/avatars/group/3/original.png?1777560876</AvatarUrl>
<AvatarUrl size="xxlarge">https://assets2-beta.my.umbc.edu/images/avatars/group/3/xxlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="xlarge">https://assets1-beta.my.umbc.edu/images/avatars/group/3/xlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="large">https://assets1-beta.my.umbc.edu/images/avatars/group/3/large.png?1777560876</AvatarUrl>
<AvatarUrl size="medium">https://assets3-beta.my.umbc.edu/images/avatars/group/3/medium.png?1777560876</AvatarUrl>
<AvatarUrl size="small">https://assets2-beta.my.umbc.edu/images/avatars/group/3/small.png?1777560876</AvatarUrl>
<AvatarUrl size="xsmall">https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="xxsmall">https://assets4-beta.my.umbc.edu/images/avatars/group/3/xxsmall.png?1777560876</AvatarUrl>
<Sponsor>Facilities Management</Sponsor>
<ThumbnailUrl size="xxlarge">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/015/4a441e0a4b15fca032a9cfaa388f6458/xxlarge.jpg?1633542042</ThumbnailUrl>
<ThumbnailUrl size="xlarge">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/015/4a441e0a4b15fca032a9cfaa388f6458/xlarge.jpg?1633542042</ThumbnailUrl>
<ThumbnailUrl size="large">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/015/4a441e0a4b15fca032a9cfaa388f6458/large.jpg?1633542042</ThumbnailUrl>
<ThumbnailUrl size="medium">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/015/4a441e0a4b15fca032a9cfaa388f6458/medium.jpg?1633542042</ThumbnailUrl>
<ThumbnailUrl size="small">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/015/4a441e0a4b15fca032a9cfaa388f6458/small.jpg?1633542042</ThumbnailUrl>
<ThumbnailUrl size="xsmall">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/015/4a441e0a4b15fca032a9cfaa388f6458/xsmall.jpg?1633542042</ThumbnailUrl>
<ThumbnailUrl size="xxsmall">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/113/015/4a441e0a4b15fca032a9cfaa388f6458/xxsmall.jpg?1633542042</ThumbnailUrl>
<PawCount>1</PawCount>
<CommentCount>0</CommentCount>
<CommentsAllowed>true</CommentsAllowed>
<PostedAt>Wed, 06 Oct 2021 13:42:23 -0400</PostedAt>
<EditAt>Tue, 12 Oct 2021 14:00:47 -0400</EditAt>
</NewsItem>

<NewsItem contentIssues="true" id="111898" important="true" status="posted" url="https://beta.my.umbc.edu/groups/fm/posts/111898">
<Title>Stadium Complex Access Improvements &amp; Stream Restoration</Title>
<Tagline>Start of Construction &amp; Campus Impacts</Tagline>
<Body>
<![CDATA[
    <div class="html-content"><p><span><span>Facilities
    Management is pleased to announce that construction activities related to the stream
    restoration and UMBC Stadium Complex access improvements will begin on Monday, September
    13<sup>th</sup>, 2021. The project consists of improvements to portions of a
    tributary of the West Branch of Herbert Run, general landscape improvements and
    new accessible walkway and pedestrian bridge between Hilltop Circle and the
    UMBC Stadium Complex. The project completion is expected summer 2022.</span></span><span></span></p><p><span><span>Construction fencing
    will be installed around the construction area for the duration of the project.
    The fencing will impact access to the stadium through existing pedestrian
    walkways and tunnel at Hilltop Circle. Access to the stadium from Hilltop
    Circle will be maintained via the walkway adjacent to the Chesapeake Employers
    Insurance Arena for the duration of the project. Pedestrian access to the
    bwtech Research Park will be maintained via the existing pedestrian bridge near
    CERA pond.</span></span></p><p><span><span>Construction vehicle
    entrances from Hilltop Circle will require closure of a handful of parking
    spaces along the outer loop of Hilltop Circle. Portions of sidewalk at the
    construction vehicle entrances will also need to be closed for the duration of
    construction. Signage will direct pedestrians around these closures, via
    accessible routes. </span></span><span>Any
    changes or additional information will be communicated through the myUMBC
    Facility Management Group and other appropriate methods. </span><span></span></p><p><span><span>Please see the
    attached diagram depicting the extents of the work and impacts to campus
    described above. Visit the Facilities Management </span></span><span><a href="https://fm.umbc.edu/" rel="nofollow external" class="bo"><span><span>website</span></span></a></span><span><span> for additional information about this and other
    University projects.</span></span><span></span></p><p><span><span>Accessibility is part
    of the design process, and we work in partnership with Accessibility and
    Disability Services which supports faculty, staff, students and visitors with
    disabilities. If you have a concern about accessibility, or want to inquire
    about a disability-based accommodation, please do so through their </span></span><span><a href="https://accessibility.umbc.edu/" rel="nofollow external" class="bo"><span><span>website</span></span></a></span><span><span>.</span></span><span></span></p><p><span><span>Thank you for your
    patience as we work to maintain and enhance the UMBC campus.</span></span><span></span></p><p><span><span>Facilities Management</span></span><span></span></p><br></div>
]]>
</Body>
<Summary>Facilities Management is pleased to announce that construction activities related to the stream restoration and UMBC Stadium Complex access improvements will begin on Monday, September 13th, 2021....</Summary>
<Website>https://fm.umbc.edu/</Website>
<AttachmentKind>Image</AttachmentKind>
<AttachmentUrl>https://assets1-beta.my.umbc.edu/system/shared/attachments/bf8310833b7b426ed5751a25dafe2f3f/69f4d14b/news/000/111/898/810f7353315b00a2900edf778bd426c9/Site Logistics.jpg?1630443447</AttachmentUrl>
<Attachments>
<Attachment kind="Image" url="https://beta.my.umbc.edu/groups/fm/posts/111898/attachments/40354"></Attachment>
<Attachment kind="Image" url="https://beta.my.umbc.edu/groups/fm/posts/111898/attachments/40355"></Attachment>
</Attachments>
<TrackingUrl>https://beta.my.umbc.edu/api/v0/pixel/news/111898/guest@my.umbc.edu/40b4896be1c5adafb0057dd805350c64/api/pixel</TrackingUrl>
<Group token="fm">Facilities Management</Group>
<GroupUrl>https://beta.my.umbc.edu/groups/fm</GroupUrl>
<AvatarUrl>https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="original">https://assets2-beta.my.umbc.edu/images/avatars/group/3/original.png?1777560876</AvatarUrl>
<AvatarUrl size="xxlarge">https://assets2-beta.my.umbc.edu/images/avatars/group/3/xxlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="xlarge">https://assets1-beta.my.umbc.edu/images/avatars/group/3/xlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="large">https://assets1-beta.my.umbc.edu/images/avatars/group/3/large.png?1777560876</AvatarUrl>
<AvatarUrl size="medium">https://assets3-beta.my.umbc.edu/images/avatars/group/3/medium.png?1777560876</AvatarUrl>
<AvatarUrl size="small">https://assets2-beta.my.umbc.edu/images/avatars/group/3/small.png?1777560876</AvatarUrl>
<AvatarUrl size="xsmall">https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="xxsmall">https://assets4-beta.my.umbc.edu/images/avatars/group/3/xxsmall.png?1777560876</AvatarUrl>
<Sponsor>Facilities Management</Sponsor>
<ThumbnailUrl size="xxlarge">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/111/898/61806a68abf250bf0c84cc86900361da/xxlarge.jpg?1630443226</ThumbnailUrl>
<ThumbnailUrl size="xlarge">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/111/898/61806a68abf250bf0c84cc86900361da/xlarge.jpg?1630443226</ThumbnailUrl>
<ThumbnailUrl size="large">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/111/898/61806a68abf250bf0c84cc86900361da/large.jpg?1630443226</ThumbnailUrl>
<ThumbnailUrl size="medium">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/111/898/61806a68abf250bf0c84cc86900361da/medium.jpg?1630443226</ThumbnailUrl>
<ThumbnailUrl size="small">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/111/898/61806a68abf250bf0c84cc86900361da/small.jpg?1630443226</ThumbnailUrl>
<ThumbnailUrl size="xsmall">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/111/898/61806a68abf250bf0c84cc86900361da/xsmall.jpg?1630443226</ThumbnailUrl>
<ThumbnailUrl size="xxsmall">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/111/898/61806a68abf250bf0c84cc86900361da/xxsmall.jpg?1630443226</ThumbnailUrl>
<PawCount>5</PawCount>
<CommentCount>5</CommentCount>
<CommentsAllowed>true</CommentsAllowed>
<PostedAt>Tue, 31 Aug 2021 17:00:25 -0400</PostedAt>
</NewsItem>

<NewsItem contentIssues="true" id="101733" important="true" status="posted" url="https://beta.my.umbc.edu/groups/fm/posts/101733">
<Title>Health Services and Counseling Building</Title>
<Tagline>Building Module Delivery &amp; Campus Impacts (5/21/21 - 6/1/21)</Tagline>
<Body>
<![CDATA[
    <div class="html-content"><p><span>Facilities Management is pleased to announce that the modules
    comprising The Center for Well-Being, which have been constructed
    off campus, will be delivered and installed on campus May 24<sup>th</sup>
    through May 28<sup>th</sup>.</span></p><p><strong><span>A
    viewing area will be provided for those interested in witnessing the
    installation first hand. It will be located along Center Road near Chesapeake
    Hall and is noted on the attached diagram.</span></strong></p>
    
    <p><span>Installation of the forty-six tractor-trailer sized modules will
    require closure of select roads and parking lots May 21<sup>st</sup> through
    June 1<sup>st</sup>.</span></p>
    
    <p><span><span>·<span>        </span></span></span><strong><span>Center
    Road</span></strong><span> north of the Health Services &amp; Counseling Building will
    become two way traffic May 21<sup>st</sup> through June 1<sup>st</sup> similar
    to the traffic pattern during spring break. Access to the Y Preschool, Hillside
    apartments and UHS will be maintained.</span></p>
    
    <p><span><span>·<span>        </span></span></span><strong><span>Poplar
    Avenue inside Hilltop Circle</span></strong><span> will be closed May 21<sup>st</sup>
    through June 1<sup>st</sup>. There will be no parking on Poplar Avenue in this
    location. Vehicular access from Park Road to Poplar Avenue and out to Hilltop
    Circle will remain open except for short periods of time when the modules are
    transported through the area.</span></p>
    
    <p><span><span>·<span>        </span></span></span><span>The north end of the <strong>Stadium Lot</strong> will be closed May 21<sup>st</sup> through May 28<sup>th</sup>.
    </span></p>
    
    <p><span><span>·<span>        </span></span></span><strong><span>Lot 23</span></strong><span> will
    be closed May 21<sup>st</sup> through June 1<sup>st</sup>.</span></p>
    
    <p><span><span>·<span>        </span></span></span><span><strong>Select parking along Hilltop Circle</strong>, between
    Poplar and Walker Avenues, will be off-line May 21<sup>st</sup> through May 28<sup>th</sup>.</span></p>
    
    <p><span>Signage will be posted throughout the area to help direct
    vehicles and pedestrians. No additional pedestrian walkway impacts are anticipated during
    this time. </span><span><span>Please see the attached diagram depicting the extents of
    the work and impacts to campus described above. Visit the Facilities
    Management </span></span><a href="https://fm.umbc.edu/" rel="nofollow external" class="bo"><span><span>website</span></span></a><span><span> for additional
    information about this and other University projects.</span></span><span></span></p>
    
    <p><span><span>Accessibility is part of the design process, and we work in
    partnership with Accessibility and Disability Services which supports faculty,
    staff, students and visitors with disabilities. If you have a concern about
    accessibility, or want to inquire about a disability-based accommodation,
    please do so through their </span></span><a href="https://accessibility.umbc.edu/" rel="nofollow external" class="bo"><span><span>website</span></span></a><span><span>.</span></span><span></span></p>
    
    <p><span><span>Thank you for your patience as we work to maintain and
    enhance the UMBC campus.</span></span><span></span></p></div>
]]>
</Body>
<Summary>Facilities Management is pleased to announce that the modules comprising The Center for Well-Being, which have been constructed off campus, will be delivered and installed on campus May 24th...</Summary>
<AttachmentKind>Image</AttachmentKind>
<AttachmentUrl>https://assets3-beta.my.umbc.edu/system/shared/attachments/42755896e333d0031d7e003ea5fb65d2/69f4d14b/news/000/101/733/50fb5ad5d9eb3bb648e6c8d18453a7f7/HSCB-Module-Install.jpg?1621007313</AttachmentUrl>
<Attachments>
<Attachment kind="Image" url="https://beta.my.umbc.edu/groups/fm/posts/101733/attachments/39757"></Attachment>
</Attachments>
<TrackingUrl>https://beta.my.umbc.edu/api/v0/pixel/news/101733/guest@my.umbc.edu/caae929092644045caec135537169169/api/pixel</TrackingUrl>
<Group token="fm">Facilities Management</Group>
<GroupUrl>https://beta.my.umbc.edu/groups/fm</GroupUrl>
<AvatarUrl>https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="original">https://assets2-beta.my.umbc.edu/images/avatars/group/3/original.png?1777560876</AvatarUrl>
<AvatarUrl size="xxlarge">https://assets2-beta.my.umbc.edu/images/avatars/group/3/xxlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="xlarge">https://assets1-beta.my.umbc.edu/images/avatars/group/3/xlarge.png?1777560876</AvatarUrl>
<AvatarUrl size="large">https://assets1-beta.my.umbc.edu/images/avatars/group/3/large.png?1777560876</AvatarUrl>
<AvatarUrl size="medium">https://assets3-beta.my.umbc.edu/images/avatars/group/3/medium.png?1777560876</AvatarUrl>
<AvatarUrl size="small">https://assets2-beta.my.umbc.edu/images/avatars/group/3/small.png?1777560876</AvatarUrl>
<AvatarUrl size="xsmall">https://assets3-beta.my.umbc.edu/images/avatars/group/3/xsmall.png?1777560876</AvatarUrl>
<AvatarUrl size="xxsmall">https://assets4-beta.my.umbc.edu/images/avatars/group/3/xxsmall.png?1777560876</AvatarUrl>
<Sponsor>Facilities Management</Sponsor>
<ThumbnailUrl size="xxlarge">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/101/733/0a350dbc0493f7d279a1000450c79729/xxlarge.jpg?1621007237</ThumbnailUrl>
<ThumbnailUrl size="xlarge">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/101/733/0a350dbc0493f7d279a1000450c79729/xlarge.jpg?1621007237</ThumbnailUrl>
<ThumbnailUrl size="large">https://assets4-beta.my.umbc.edu/system/shared/thumbnails/news/000/101/733/0a350dbc0493f7d279a1000450c79729/large.jpg?1621007237</ThumbnailUrl>
<ThumbnailUrl size="medium">https://assets3-beta.my.umbc.edu/system/shared/thumbnails/news/000/101/733/0a350dbc0493f7d279a1000450c79729/medium.jpg?1621007237</ThumbnailUrl>
<ThumbnailUrl size="small">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/101/733/0a350dbc0493f7d279a1000450c79729/small.jpg?1621007237</ThumbnailUrl>
<ThumbnailUrl size="xsmall">https://assets2-beta.my.umbc.edu/system/shared/thumbnails/news/000/101/733/0a350dbc0493f7d279a1000450c79729/xsmall.jpg?1621007237</ThumbnailUrl>
<ThumbnailUrl size="xxsmall">https://assets1-beta.my.umbc.edu/system/shared/thumbnails/news/000/101/733/0a350dbc0493f7d279a1000450c79729/xxsmall.jpg?1621007237</ThumbnailUrl>
<PawCount>4</PawCount>
<CommentCount>0</CommentCount>
<CommentsAllowed>true</CommentsAllowed>
<PostedAt>Fri, 14 May 2021 11:54:18 -0400</PostedAt>
<EditAt>Fri, 21 May 2021 07:08:00 -0400</EditAt>
</NewsItem>

</News>
