Along with other participants in UMBC's 2011 university retreat, I took a tour of the Performing Arts and Humanities Building construction site. The building rising on the site is slated to be completed next summer. Construction on a second, adjacent building will commence in 2012 and be completed in 2014.
Approaching the (future) grand entrance |
The two-story foyer |
The rehearsal studio |
The main theater (control booth is visible on 2nd floor) |
The fly tower (backstage), where people and scenery will be raised and lowered |
View from the Dresher Conference Room (2nd floor) |
Dresher Conference Room, from across the foyer |
View from the 4th floor toward downtown Baltimore. I'd like to think that once the building opens, the weather will always be just like this. |