The building hot water will be off from Monday March 14th through possibly the 18th. Hot water in the restrooms, at the lab sinks and in the HVAC systems are all going to be impacted. This is over spring break and hopefully will impact the labs the least. Temperatures are predicted to be in the mid 60s next week so a lab coat or sweater may be advised for when you are in the building. Sorry for the inconvenience, but this is a critical milestone for the renovation of the 1st floor HVAC system. Additional information will be forthcoming from facilities Management and I will pass that on when I get it.